Northwestern Pacific Railroad Network

Dedicated to Sharing the Heritage of Redwood Empire Railroading

James Bradley, Jr.'s Blog (5)

Proposed Changes to NCRA/NWP Crossings in Ukiah

I found these documents on the CPUC (California Public Utilities Commission) website regarding proposed changes to the NCRA/NWP crossings in Ukiah:

 

ftp://ftp.cpuc.ca.gov/rail/RCEB/GO88/2015/XREQ2015010001_GobbiSt_Ukiah.pdf…

Continue

Added by James Bradley, Jr. on June 11, 2015 at 3:14pm — 1 Comment

Cost of Repairs - NWP Track North of Windsor

At the NCRA Board of Directors meeting today, NCRA will be presented with an estimate to repair the rail line from Windsor to Redwood Valley, which is North of Ukiah.  In the report, NCRA will be presented with four different scenarios, and will decide which repair scenario is the most economical for them to proceed with.

  1. Windsor - Redwood Valley (59.4 miles)
    1. Estimated Cost from NWP - $20.7 million
    2. Repairs line to North end of siding, MP 122.3
      1. Replace…
Continue

Added by James Bradley, Jr. on March 12, 2014 at 2:00am — 31 Comments

© 2019   Created by Mark Drury.   Powered by

Badges  |  Report an Issue  |  Terms of Service