     This is something that I've been thinking about for a long time.  I do understand that the board of SMART has to finish building all of the original system first. The 70 mile line from Larkspur to Cloverdale. But after that what direction do we go. That will depend on local support. I do believe that someday SMART will serve Mill Valley, Tiburon and Sausalito. But before that happens a next extension south could be Corte Madera. I makes sense because SMART already owns the right of way across Corte Madera Creek right up to the Corte Madera shopping center.

  Remember we are talking 2026. That is the time line that SMART is running under. Yes the parking lot at Larkspur Station would have to relocated. There would have to be some type of grass roots organization, in Corte Madera, to take this on and really push for. If you can't tell by now I'm an optimist. Instead of trying to tear things down. I constantly look for ways to build friendships and organizations.

  And so it begins!

Views: 263

Reply to This

Replies to This Discussion

Richard,

With all due respect, I don't understand why you are submitting a discussion about SMART when this site is a NWP site. Can you explain? Should you not be finding a SMART site for this discussion?

Thank you,

Al

Actually, the NWP runs on the SMART RoW.  And SMART runs on the historic NWP RoW, so the two are tightly interwoven, as hundreds of messages, photographs, and videos on this site will attest.  In fact, all the connecting railroads and even many distant railroads are discussed here too.  I find the variety interesting and avoids any debates about what constitutes "pure NWP". 

Well, there's no way that any reactivation of the line south of the Larkspur Landing station would reuse the remnants of the old Dirty Harry trestle or the existing drawbridge.  Probably a good thing because the new pedestrian bridge blocks that former alignment almost perfectly.

https://goo.gl/maps/3vFKStzW9YR2

But it would be possible to build a new railroad bridge west of the historic alignment and have the line curve back to the southern landing.  Not saying this would be a good idea fiscally, but from a civil point of view it would be possible.  The new RR crossing would be elevated over the north-western part of the pedestrian ramp, providing ample clearance.

Before actually looking at that areal view I assumed that SMART sealed the deal to cut-off Corte Madera with that pedestrian bridge.  But, it appears that a parallel structure could be constructed, ... at tremendous expense.

If the Cal Park Hill tunnel cost $30M to re-open, imagine the cost to build a new bridge across Corte Madera Creek?

 Does anyone know whether the original bascule bridge, over Corte Madera Creek, is worth saving. I know the approaches will have to be completely replaced. 