Northwestern Pacific Railroad Network

Dedicated to Sharing the Heritage of Redwood Empire Railroading

When we sold the north end (MP 142.5 - Samoa) in 1984, I recall the Eureka Southern began operation using train orders, Direct Traffic Control was implemented on the south end (Schellville - Willits) shortly after the sale, probably in 1985. Does anyone recall when DTC replaced train order operation on the north end? My documentation has a large gap in tine, Eureka Southern Timetable No. 1 (1985) is train order operation, North Coast Railroad Timetable No. 1 (1993) is Direct Traffic Control operation. 

Thanks,

Dave Bernstein

Views: 174

Reply to This

Replies to This Discussion

I'll try to see what I can find on the web. I am also building the Eel River portion of NWP in Train Simulator.

RSS

© 2017   Created by Mark Drury.   Powered by

Badges  |  Report an Issue  |  Terms of Service